AlphaESS Helps Reduce Energy Costs with Peak Shaving and Retired Battery Solutions for a Factory Expansion
2023-02-15
-
Project
360 kW/1.5 MWh
-
Application
PV + Storage
-
Address
Nantong, Jiangsu
The project located in Nantong was established due to high electricity costs for the client company and peak electricity usage differences in the morning and evening. To save on electricity bills, the company chose to use an energy storage system for peak shaving, charging during low-peak times and discharging during high-peak times. The BMS battery management technology from AlphaESS was used to maximize the use of retired power batteries for the factory's expansion, which helped to meet peak shaving needs and save costs overall, aligning with the country's requirement for energy conservation and emissions reduction.

-
Enhancing Microgrid Resilience with Solar, Storage & Diesel Integration2026-07-09
-
Ensuring Uninterrupted Energy for Africa's First BIPV Landmark through Advanced Storage2026-07-09
-
Ending Power Outages and Boosting Profitability for High-Traffic Commercial Hubs2026-07-09
-
Enhancing Energy Value with Commercial & Industrial Storage2026-07-09